A local developer has announced plans to handover the Mesk and Noor Residential Districts, representing Phase 3 and Phase 4 of its Midtown master development in Dubai. Together, they feature over 900 residential units with a mix of studios, one-, two- and three-bedroom apartments.
The Mesk District handover will begin on 14 February, ahead of its scheduled handover timeline, and move-in for residents will be permitted effective mid-February. The Noor District will be delivered as per schedule by the end of June, said a statement from the developer. More than 95% of the units in Noor District have been already sold out, it added.
With this, the Dubai developer will complete the handover of more than 2,200 units across the four districts of the Midtown development.
The developer had earlier completed and handed over Afnan District in 2019, followed by Dania District in 2020. Over 1,100 families are currently living in the Midtown Community, the developer stated.
Located in Dubai Production City near Sheikh Mohammed bin Zayed Road, Midtown is designed with community living in mind, creating a family-friendly environment replete with a wide range of amenities.
The CEO said, “The handover of the Mesk and Noor Residential Districts of our iconic Midtown master community is a major milestone, and we are thrilled to reinforce our commitment to deliver ahead of our scheduled timeline of handover for our projects to ensure a world-class service for our key stakeholders, investors and customers. Mortgage solutions with up to 25 years’ repayment plans are available for potential buyers in the Mesk District.”
In early January 2023, the CEO said it would deliver 11,000 units in Dubai in 2023.
GETO aluminum formwork system is very suitable for residential project, the system is designed according to the drawings, the contracting just need to install the system at the construction site, saving construction period and cost.
GETO aluform system advantages:
1. Less construction cost.
The cost saving throughout the whole construction progress from deflect rectification, machinery, additional conventional formwork cost, time etc.
2. Excellent quality.
GETO aluminum formwork system does not require plastering as the off-the-form finish is less than 3.5mm tolerance in deflection.
3. Speed.
The wall, beam, column, slab can be casted at one time by using GETO aluminum formwork. Furthermore, our prop-head system will allow to dismantling the slab panels without removing the props. Thus, 6 days cycle is no longer a dream but a reality.
4. Light weight.
The system panel is an easily handling & handheld product. All components almost can be transfered by labour through the slab transfer box during the installation, dismantling & transferring due to the light wight with 25kg/m2.
5. Cycle use.
Aluminium formwork of GETO system are designed for strength and maximum usability. This provides the ability to reuse your existing GETO panel stock into new project designs in order to maximize value and return on investment of your GETO formwork assets.
6. Environment friendly.
By minimizing the usage of limited resource such as plywood and timber, GETO provides environment-friendly product.
Published: Jan 17, 2023
Last published: Dec 30, 2022