Why GETO Formworks

At GETO, we give top priority to user experience. To offer better services, we always stand in the shoes of our clients and make great efforts to consider all details, even the tiniest.

  • Higher Reusability

    By using quality material and adopting the latest welding technology, GETO formwork's reuse can be up to 300-500 times

  • Plastering-free Concreting

    We can minimize the possibility of hollowing and cracking of concreting to zero to achieve real plastering-free concreting.

  • Lower Costing

    With large production capacity and refined manufacturing process, GETO can provide superior formworks at lower prices.

Lean Production & Management

To control cost and maintain competitive prices, GETO has developed scientific manufacturing management which can not only improve productivity, but also better control quality.

A worker is loading material in warehouse
DPS System

It is a computer-assisted paperless picking system. When we submit the order information to system, the computer automatically completes the accounting process.

According to data given by the system, the warehouse will feed materials for each production stage timely, which ensures efficient picking work.

In this way, it avoids mistakes and saves labor costs to help us keep competitive prices.

The stamps are pressed on profiles to trace quality
Production Traceability System

Our stamp tracking system enables us to eliminate manufacturing mistakes and take timely adjustments by labeling each stage in the welding process with a stamp that records the worker's operation and other information technology to prevent errors, and help with monitoring, real-time analysis, tracking, etc.

In this way, our lean production and management can greatly improve production efficiency and product quality.

Performance Of Different Welding Methods

Our perfect workmanship will ensure product quality and on-time delivery.

  • Our robot welding process
    Robot Welding

    Standard plates are combined through the most efficient robot welding to ensure productivity and quality.

  • Our friction stir welding technology
    Friction Stir Welding

    Broad panels can be stitched together seamlessly by friction stir welding to enhance loading capability.

  • An experienced worker is welding panels
    Manual Welding

    Irregular plates and small cutting pieces are seamed by experienced welders.

Want to see more? Here are our other projects you'll like

  • Satra’s Eastern Height P47

    Satra’s Eastern Height, India

    Satra’s Eastern Height P47
    Satra’s Eastern Height P47
    Satra’s Eastern Height P47
    Satra’s Eastern Height P47
    Satra’s Eastern Height P47

    Satra’s Eastern Height, India

    This is a very nice Butterfly-shaped project. And it is evident that it is a very complicated project, for it has not only structural changes between floors, but also a lot of circular arcs. The owner’s high requirement on project schedule even adds to its complexity and difficulty. 

    In the end, GETO not only enabled fast and efficient construction, but also nicely completed the aesthetic missions. 

    Related Products

  • This is the first application try of aluminum formwork in podium floors. As required by customer, a specially tailored formwork solution is made to facilitate smooth concrete pouring for the podium with big circular columns (Dia.900 mm ) and a spiral sloping ramp.

    Queen Peak, Singapore

    Queen Peak Singapore 1
    This is the first application try of aluminum formwork in podium floors. As required by customer, a specially tailored formwork solution is made to facilitate smooth concrete pouring for the podium with big circular columns (Dia.900 mm ) and a spiral sloping ramp.
    This is the first application try of aluminum formwork in podium floors. As required by customer, a specially tailored formwork solution is made to facilitate smooth concrete pouring for the podium with big circular columns (Dia.900 mm ) and a spiral sloping ramp.

    Queen Peak, Singapore

    This is a 26-floor residential building located in Dundee Road, Singapore.

    The main challenge for this project is to find a formwork and scaffolding solution for the differently arranged cantilevered balconies which is projected outwards up to 4.2 meters.

    GETO provided a complete formwork solution for walls, columns, slabs, staircases, elevator shafts, and balconies and also collaborate in the supply of climbing scaffold system. All these allowed our clients to complete projects on time efficiently.

    Related Products

  • Lotus View, India

    Lotus View, India

    Lotus View, India
    Lotus View, India

    Lotus View, India

    This is the first application try of aluminum formwork in podium floors. As required by our customers, a specially tailored formwork solution is made to facilitate smooth concrete pouring for the podium with big circular columns (Dia.900 mm ) and a spiral sloping ramp.