• Bedok North Woods, Singapore

    Bedok North Woods, Singapore

    Bedok North Woods, Singapore
    Bedok North Woods, Singapore
    Bedok North Woods, Singapore
    Bedok North Woods, Singapore

    Bedok North Woods, Singapore

    This is one of Singapore HDB (Housing & Development Board) residential projects, in which precast systems are widely used, averagely 70% by volume of the entire structural concrete used during the construction stage.

    The main challenge lied in the shell optimization to ensure accurate connection joints between precast components, especially under the HDB category of thousands of items. 

  • Ampang Hilir, Malaysia

    Ampang Hilir, Malaysia

    Ampang Hilir, Malaysia
    Ampang Hilir, Malaysia
    Ampang Hilir, Malaysia
    Ampang Hilir, Malaysia
    Ampang Hilir, Malaysia
    Ampang Hilir, Malaysia
    Ampang Hilir, Malaysia

    Ampang Hilir, Malaysia

    In this project, GETO helped the client activate their own formwork on stock, which is from a Korean supplier, aiming to help maximizing the value of customer’s investment, no matter the formwork is from GETO or is from other brands.

    As a result, around 2300 sqm stock formwork was re-used, which took up more than 70% of total formwork amount for this project.

    Related Products

  • GARDEN IN THE AIR (GIA TOWER), Kambodia

    Garden In The Air (GIA Tower), Cambodia

    GARDEN IN THE AIR (GIA TOWER), Kambodia
    GARDEN IN THE AIR (GIA TOWER), Kambodia
    GARDEN IN THE AIR (GIA TOWER), Kambodia
    GARDEN IN THE AIR (GIA TOWER), Kambodia
    GARDEN IN THE AIR (GIA TOWER), Kambodia
    GARDEN IN THE AIR (GIA TOWER), Kambodia

    Garden In The Air (GIA Tower), Cambodia

    GETO took part in the construction work of splendid 43- floor office building in Diamond Island, Cambodia.

    GETO Self-climbing platform was used. The main difficulties in this project lay in finding a solution with optimized scaffolding constitution as well as adjusted the up-lifting procedure for extra-high floors of 7.3 meters at Floor 18 and Floor 28.

    This is one part of GETO’s great job ensuring the safety of workers increase and boosting construction productivity of the project.

    Related Products

  • Algerian tunnel formwork 3

    Tunnel Formwork, Algeria

    Algerian tunnel formwork 3
    Algerian tunnel formwork 3
    Algerian tunnel formwork 3

    Tunnel Formwork, Algeria

  • This is the first application try of aluminum formwork in podium floors. As required by customer, a specially tailored formwork solution is made to facilitate smooth concrete pouring for the podium with big circular columns (Dia.900 mm ) and a spiral sloping ramp.

    Queen Peak, Singapore

    Queen Peak Singapore 1
    This is the first application try of aluminum formwork in podium floors. As required by customer, a specially tailored formwork solution is made to facilitate smooth concrete pouring for the podium with big circular columns (Dia.900 mm ) and a spiral sloping ramp.
    This is the first application try of aluminum formwork in podium floors. As required by customer, a specially tailored formwork solution is made to facilitate smooth concrete pouring for the podium with big circular columns (Dia.900 mm ) and a spiral sloping ramp.

    Queen Peak, Singapore

    This is a 26-floor residential building located in Dundee Road, Singapore.

    The main challenge for this project is to find a formwork and scaffolding solution for the differently arranged cantilevered balconies which is projected outwards up to 4.2 meters.

    GETO provided a complete formwork solution for walls, columns, slabs, staircases, elevator shafts, and balconies and also collaborate in the supply of climbing scaffold system. All these allowed our clients to complete projects on time efficiently.

    Related Products

  • Lotus View, India

    Lotus View, India

    Lotus View, India
    Lotus View, India

    Lotus View, India

    This is the first application try of aluminum formwork in podium floors. As required by our customers, a specially tailored formwork solution is made to facilitate smooth concrete pouring for the podium with big circular columns (Dia.900 mm ) and a spiral sloping ramp.

    Related Products

  • Satra’s Eastern Height P47

    Satra’s Eastern Height, India

    Satra’s Eastern Height P47
    Satra’s Eastern Height P47
    Satra’s Eastern Height P47
    Satra’s Eastern Height P47
    Satra’s Eastern Height P47

    Satra’s Eastern Height, India

    This is a very nice Butterfly-shaped project. And it is evident that it is a very complicated project, for it has not only structural changes between floors, but also a lot of circular arcs. The owner’s high requirement on project schedule even adds to its complexity and difficulty. 

    In the end, GETO not only enabled fast and efficient construction, but also nicely completed the aesthetic missions. 