All-Round Advantages of Aluminium Formwork

  • Timber Formwork

    On site management of timber formwork
    • Pros:

      It is light-weight at cheaper buying cost, and can be cut arbitrarily for different projects. Suitable for low-rise building construction.

    • Cons:

      With shorter lifespan, it will increase cost in high-rise building construction. Arbitrary cutting means higher possiblity on material waste and higher cost in skillful labor.

    • Weight
      • highlight icon
      • highlight icon
      • highlight icon
      • highlight icon
    • Lifespan
      • highlight icon
      • highlight icon
    • Efficiency
      • highlight icon
    • Strength
      • highlight icon
      • highlight icon
    • Concreting performance of timber formwork

      Timber Concreting

    • The assembling of timber formwork

      Timber On Site

  • Steel Formwork

    The assembling of steel formwork
    • Pros:

      With large load capacity, it delivers better concreting performance than timber.

    • Cons:

      It is too heavy for single-person operation and has to rely on tower cranes for material transfering. It also gets rusted easily in the working environment.

    • Weight
      • highlight icon
    • Lifespan
      • highlight icon
      • highlight icon
      • highlight icon
    • Efficiency
      • highlight icon
      • highlight icon
    • Strength
      • highlight icon
      • highlight icon
      • highlight icon
      • highlight icon
      • highlight icon
    • Concreting performance of steel formwork

      Steel Concreting

    • On site management of steel formwork

      Steel On Site

  • Best Value

    Aluminium Formwork

    The assembling of aluminium formwork
    • Pros:

      Large load capacity, light weight, high efficiency, low cost and long working life. It is optimal for high-rise building construction by delivering perfect concreting at affordable prices.

    • Cons:

      The initial investment is high, but the budget can be controlled in long-term usage.

    • Weight
    • Lifespan
    • Efficiency
    • Strength
    • Concreting performance of aluminium formwork

      Aluminium Concreting

    • On site management of aluminium formwork

      Aluminium On Site

Formwork In Figures

The data never lies, which will explain why more and more builders turn to aluminium formwork in the world.

Technical DataTimber FormworkSteel FormworkGETO Aluminium Formwork
Loading Capacity (KN/㎡)306060
Reusage8200300
Assemble & DismantleDifficultDifficultEasy
Dependence On Tower CraneNoHighNo
Scrap ValueLowMiddleHigh
Maintainence CostLowHighLow
Attrition RateHighMiddleLow
Concreting PerformanceCoarseFlatFree of Plastering
Possibility of LeakageHighLowLow
Floor Cycle10-12 Days/Floor8-10 Days/Floor4-6 Days/Floor
ApplicationsThe Whole BuildingWallsThe Whole Building

Why Aluminium Formwork

  • advantage icon
    Superior Concreting

    GETO aluminium formwork can 100% turn your design into reality and achieve no-plastering concreting to lower your cost on building surface decoration.

  • advantage icon
    Cost-Saving

    It will create less waste on site, need less labor in operation, simplify site management and shorten your construction schedule, which all means saving budget.

  • advantage icon
    Quick Turnover

    With an average turnover period of 4 days/ floor, aluminium formwork can improve productivity significantly and save site cost.

  • advantage icon
    High Reusability

    Within its lifespan, the aluminium formwork can be reused over 300 times, which will save 30% budget in total, compared with timber formwork and steel formwork.

Build Your Business Success With GETO Formworks

Contact Us
ArabicChinese (Simplified)EnglishFrenchPortugueseRussianSpanish