7 steps to produce PPVC Housing Precast Formwork – GETO

13
744

How to produce PPVC Housing Precast Formwork?

Arrival of raw material

Row material

Cutting length with laser cutting machine

laser cuttting machine

Welding for internal framework model

Internal framework model

Hoisting interior and exteranl framework

Interior and external framework

Hydraulic system installation

Hydraulic system

Spray painting for steel formwork reinforcement surface

Steel formwork reinforcement surface

Package and delivery

package and delivery

Related article:

https://www.getoformwork.com/industry-news-articles/ppvc-housing-precast-formwork-system-geto/

https://www.getoformwork.com/enterprise-news-articles/geto-ppvc-housing-precast-formwork-system/

INQUIRY

#PPVChousingprecastformworksystem

#GETO

#prefab

#prefabricated

#ppvc

#construction

#singapore

Published: June 30, 2022

Last published: June 17, 2022