Advantages
- High economic benefits: Save 30%-50% of building costs.
- Environmentally friendly: Save construction materials and electricity.
- Safe and reliable: All-steel structure with full protection and specialized safety features.
- Intelligent: Equipped with a monitoring system for load safety.
- Neater construction site.
Technical Data Of GTP100 Automatic Hydraulic Climbing Formwork System
S/N |
Item |
Specification |
1 |
Lifting Capacity (Single-Unit Climbing Platform) |
100kN |
2 |
Segmented Standard Pouring Height |
3.0m-5.5m |
3 |
Maximum Climbing Height |
5 min/m |
4 |
Influence Width per Bracket |
About 4m (Subject To Project Specifics) |
5 |
Working Platform Width |
2.4m |
6 |
Max Inclination |
+/-10° |
7 |
Driving Force |
Hydraulic Power |
8 |
Wall Formwork System |
Aluminium Formwork/Steel Formwork/Timber-Beam Formwork |
Operating Conditions
Conditions for climbing formwork construction an dclimbing:
- No severe weather conditions (e.g., thunderstorms, rain, snow,fog,frost, haze,orhail) during operation.
- Basic wind pressure does not exceed level 5 (approximately24.5-28.5 m/s).
In wind speeds over level 7 (approximately 13.9-17.1 m/s), typhoon reinforcement measures are required for the climbing formwork bracket.
*Note: Referring to the technical standards outlined in the Technical Standard for the Hydraulic climbing Formwork Engineering of the People's Republic of China.